I-11 Feasibility Study
The I-11 corridor is envisioned as a major north-south multimodal corridor that will provide enhanced transportation mobility and movement of goods between Mexico and Canada.
7th Street Improvements
Parametrix created a Civil FX interactive digital twin experience to illustrate how the proposed design would look and function.
Alpine Lakes Wilderness Survey
Parametrix provided survey mapping of the Alpine Lakes Wilderness area of the Cascades Range in Eastern Washington State. To carry out this task, the Parametrix
Oregon Cooling Needs
The Oregon Cooling Needs Study assesses cooling and related needs in Oregon’s most vulnerable housing types.
Greenhouse Gas Inventory and Climate Action
Parametrix assisted New Seasons with a climate action roadmap toprepare their company to set climate targets and take action to ensure the reduction of climate
Eugene GHG Inventories, Climate Action Planning and Building Decarbonization
Through the adoption of the Climate Recovery Ordinance (CRO) and the original Climate and Energy Action Plan, the City of Eugene’s elected and administrative leadership
Powell Butte Highway Roundabout
Residents had been avoiding the intersection of Powell Butte Highway with Neff and Alfalfa Market Roads because of safety concerns due to high speeds and
Empire Corridor Improvements
Improvements to the Empire Corridor represent long-term multimodal solutions that allow the City to balance connectivity, safety, and user improvements with increased traffic from local
Canopy/Effective Shade Evaluation
The City of Lake Oswego needed to update its Total Maximum Daily Load (TMDL) Implementation Plan to continue protection of its water resources and to